Malaysia Boleh! Haiyo I really have to words to saylah. As you can see from the pictures below, JBA is doing what it's best at doing again in front of my house, replacing bursted underground pipes. The digging tonight is the fourth time since I moved in July 14 2001. The first was in 2005, then in May 2006 and the last time was in Dec 2007. Not that I care but the inconvenience of going in and out of the house after the digging is really stressful lah! Not to mention the dirt and dust. Screw JBA!
What is wrong with our piping system? The underground pipes in my housing area have been bursting with an average of at least one case every two weeks.
Have JBA been shortchanged by the contrator who laid the pipes when this housing area was developed or was there any hanky panky? Someone in JBA should assume responsibility and give an explanation on this matter. Maybe I should go look for that assemblyman of mine YB Cha Kee Chin for help. Anybody got any suggestions?
What is wrong with our piping system? The underground pipes in my housing area have been bursting with an average of at least one case every two weeks.
Have JBA been shortchanged by the contrator who laid the pipes when this housing area was developed or was there any hanky panky? Someone in JBA should assume responsibility and give an explanation on this matter. Maybe I should go look for that assemblyman of mine YB Cha Kee Chin for help. Anybody got any suggestions?
The Backhoe Loader digging
Removing the faulty poly pipe
And replacing with this 20' PVC pipe
This was after everything was done and crusher run laid

No comments:
Post a Comment